12 April 2016

Visit of the building site

The site is changing very fast. From the outside, we see that the gateways are installed and the metal cladding takes shape. Inside, the colors change, the doors leave no more empty frames, electrical outlets are present, the benches dress gradually laboratories, ceilings are adorned with lights and strange posters adorn some walls.